- Communicate contractors and clients with good relationship
- Consider specification of fuel supply facilities, piping and combustion equipment with vendors
- Check specification of facilities to install with international guideline (Ex. ASME etc…)
- Discuss specification with vendors and check it from them
- Apply/modify/update DOEB license
- Learn unexperienced fields with positive thinking
- Manage Project of construction or modification of fuel supply facilities, piping and combustion equipment
- Project site: industrial estate in Rayong, Korat, Prachinburi Etc.
1. Manage and oversee all mold maintenance activities to ensure the efficiency and reliability of production processes—particularly in die casting operations for the automotive industry—through effective implementation of preventive and corrective maintenance strategies.
2. Perform preventive and corrective maintenance, as well as repair of molds.
3. Manage spare parts and inventory to ensure availability and proper control.
4. Ensure compliance with safety and quality standards.
5. Lead and develop the maintenance team to enhance skills, productivity, and performance.
6. Ensure all molds are operational and ready to meet production demands.
7. Reduce unplanned downtime and minimize product defects caused by mold-related issues.
8. Continuously improve the skills and performance of the mold maintenance team.
1) Research and implement new motor technologies to reduce costs and improve competitiveness
2) Manage motor development projects to ensure alignment with project master plans and schedules.
3) Collaborate with mid-engineers, and manager to gather requirements and define motor specifications.
4) Coordinate between departments, including suppliers and partners.
5) Risk Management and develop strategies to address challenges.
6) Promote process improvement, teamwork, and ongoing efficiency enhancements.
• Handling customer claims and quality investigations.
• Operating and monitoring quality improvements and prevent action report abilities
• Demonstrated experience in executing test case and analyzing results
• Contacting and negotiating with customers and suppliers
• Visit suppliers and customers
• Prepare and issue the related report or documents. (APQP, PPAP, FMEA, MSA, SPC) and IATF16949
• Other task as assigned
• Handling customer claims and quality investigations.
• Operating and monitoring quality improvements and prevent action report abilities
• Demonstrated experience in executing test case and analyzing results
• Contacting and negotiating with customers and suppliers
• Visit suppliers and customers
• Prepare and issue the related report or documents. (APQP, PPAP, FMEA, MSA, SPC) and IATF16949
• To lead quality teams, manage corrective action plans, and drive continuous improvement initiatives.
• Other task as assigned
1) Manage Module development projects to ensure alignment with project plans and schedules. (Refrigerant cycle:Required, Chassis:If any)
2) Collaborate with engineers, and all stakeholders to gather requirements and define module specifications.
3) Coordinate between departments, including suppliers and partners.
4) Risk Management and develop strategies to address challenges.
5) Control project budgets and report project status to management.
6) Promote process improvement, teamwork, and ongoing efficiency enhancements.
7) Promote the growth of the team and members.
- Collaborate with Project, Maintenance, and Factory Managers, as well as subcontractors, to ensure proper allocation and tracking of resources
- Collect sufficient information onsite for troubleshooting purposes
- Perform equipment measurements (e.g., pumps, valves) at customer sites
- Prepare documentation of critical analysis and provide recommendations for corrective actions
- Identify deficiencies in mechanical processes and propose improvements
- Deliver goods and visit customers as needed
- Conduct technical presentations using PowerPoint
- Communicate technical knowledge clearly and effectively
- Work closely with the Company Director and Sales member
- Develop and submit technical reports to the Director and Sales member
Timeline:
- Monitor project timelines based on established start dates and deadlines
- Coordinate with the team to develop strategies that prevent or minimize project delays
Report:
- Prepare clear and concise analysis or related reports based on sufficient information
- Communicate technical findings accurately and understandably to responsible personnel
・Perform routine maintenance and repairs on construction machinery
・Diagnose and troubleshoot mechanical issues
・Conduct inspections to ensure equipment is in optimal working condition
・Respond to service calls and provide on-site support
・Maintain service records and prepare reports on machinery condition
・Prepare machine for customer order
・Direct report to Service Manager
・Perform routine maintenance and repairs on construction machinery
・Diagnose and troubleshoot mechanical issues
・Conduct inspections to ensure equipment is in optimal working condition
・Respond to service calls and provide on-site support
・Maintain service records and prepare reports on machinery condition
・Prepare machine for customer order
・Direct report to Service Manager
Design the refrigerant circuit of multi air for building (VRF indoor unit & outdoor unit)
Responsible for the overall design of the refrigerant circuit of multi air-con for building (VRF indoor unit & outdoor unit) including manage project overview.
1. Design product specifications
-Determine the product specifications that can be achieved according to the product requirements, such as the target capacity and efficiency, the scope of operation temp, size, etc.
-Embrace the design issues and risks, and plan for strategic risk reduction
-Design the refrigerant circuit (consider the circuit structure and the appropriate amount of refrigerant)
-Design (Compressor, heat exchanger, Solenoid valve, Capillary, etc.) and select (test for efficiency and suitability) the refrigerant circuit parts
2. Prototype・Check
-Prepare product drawings and adjust with vendor parts
-Test and check the prototype part and analyze the test results with feedback on problematic points
3. project management (cross-organization management)
-Manage the overall progress of the refrigerant circuit design project, adjust the schedule and manage the budget
-Coordination of the overall project, including contacting and cooperating with various departments
-Implement the design policy and implement the strategy
-Evaluate the overall performance of the team, develop personnel, and promote the improvement of the work process
4. Document preparation
-Prepare design doc, technical report, and management-related reports (mainly in English)
※【Role as a manager】
>> Responsible for managing the overall project, developing and supervising team members, supporting the development of work quality
>> Contacting, cooperating, and negotiating with partners outside the department and executive level, and supporting strategic decision-making
>> Not only in terms of technical aspects, but also promoting the improvement of work processes and organization management
• Analyze production data, identify performance bottlenecks, and develop solutions to optimize process parameters and increase overall plant efficiency.
• Lead a team of process engineers to drive continuous improvement initiatives aimed at enhancing efficiency, reducing costs, and improving product quality.
• Conduct regular audits and assessments of production systems, equipment, and workflows to identify areas for improvement and innovation.
• Collaborate with cross-functional teams including production, maintenance, quality control, and environmental health & safety to streamline processes and achieve operational excellence.
• Lead continuous improvement projects focused on process efficiency and cost reduction.
• Foster a culture of innovation and operational excellence within the process engineering team.
• Manage end-to-end R&D projects including planning, scheduling, execution, and delivery.
• Collaborate with cross-functional teams in Japan and Thailand to ensure project alignment and timely delivery.
• Coordinate with internal and external stakeholders (design, engineering, procurement, quality assurance, etc.)
• Monitor progress, identify risks and propose mitigation plans.
• Prepare and present reports and documentation in English and Japanese.
• Support budget planning and resource allocation for projects.
• Visit clients to perform maintenance on their products, primarily boilers.
• Diagnose and troubleshoot issues, executing repairs and adjustments for optimal performance.
• Listen to client needs to provide tailored support and suggest improvements.
• Prepare detailed reports on maintenance activities and client interactions.
• Other related jobs
・Manage technical works and maintenance requirement for team
・Monitoring customer ‘s requirement and expand new service
・Follow up soil & ground water monitoring including analysis work to make the reports
・Prepare Estimate and ISO Document
・Assist team for document support, contact customers and techniques.
・Inquire into problem and customer satisfaction, giving consult and solve problems
・Manage technical works and maintenance requirement for team
・Monitoring customer ‘s requirement and expand new service
・Follow up soil & ground water monitoring including analysis work to make the reports
・Prepare Estimate and ISO Document
・Assist team for document support, contact customers and techniques.
・Inquire into problem and customer satisfaction, giving consult and solve problems
(1) Production Management… Production planning, inventory management and material procurement, Daily production report management
(2) Production workforce management… Approve - plan employee leave, set work schedule
(3) Factory management… Calculate production cost and prepare related documents
(4) General factory operations… Machinery/consumables management in the factory
(5) Purchasing raw materials, materials used for production, sourcing suppliers, negotiating purchases - contracts
(6) Business partners management… Understanding the status of suppliers and equipment companies
(7) Inventory management - External distribution warehouse, logistics company selection, incoming goods planning
- Achievement of maintenance cost target
- Making a maintenance plan and follow up
- Conclusion report of maintenance in every month
- Achievement of zero accident in factory
- Achievement of Break down time all factory
I. Operate Scope of Work
・Make design drawing & for Construction drawing
・Assist for making tender scope & drawing for large project or moderately complex project
・Assist for making presentation & VECD item
・Assist for plan & design overall concept
・Control design schedule
・Assist with Training and review work of Junior Staff
II. Solve Complexity Problem
・Understand existing site condition & Make Q&A at Tender stage
・Able to explain tender document & owner’s document to Sub-contractor
・Conclude & make final tender scope & drawing
・Cooperate with other work-related drawings, reply design review comment & able to review outsource design drawing
・Assist for making addition & deduction work drawing, including owner’s meeting
III. Knowledge about work
・Understand and apply law & regulation
・Understand design work
・Understand subcontractor drawing & supplier product
・Make pre-check design comment sheet
IV. Section's supervision
・Make application drawing, including another related document
・Assist for comment & approve Mechanical shop drawing and material
・Make DCI Document
・Assist for Inspection Mechanical product at workshop
・Assist for design inspection
I. Operate Scope of Work
・Make design drawing & for Construction drawing
・Assist for making tender scope & drawing for large project or moderately complex project
・Assist for making presentation & VECD item
・Assist for plan & design overall concept
・Control design schedule
・Assist with Training and review work of Junior Staff
II. Solve Complexity Problem
・Understand existing site condition & Make Q&A at Tender stage
・Able to explain tender document & owner’s document to Sub-contractor
・Conclude & make final tender scope & drawing
・Cooperate with other work-related drawings, reply design review comment & able to review outsource design drawing
・Assist for making addition & deduction work drawing, including owner’s meeting
III. Knowledge about work
・Understand and apply law & regulation
・Understand design work
・Understand subcontractor drawing & supplier product
・Make pre-check design comment sheet
IV. Section's supervision
・Make application drawing, including another related document
・Assist for comment & approve Mechanical shop drawing and material
・Make DCI Document
・Assist for Inspection Mechanical product at workshop
・Assist for design inspection
1) Manage motor development projects to ensure alignment with project plans and schedules.
2) Collaborate with engineers, and all stakeholders to gather requirements and define motor specifications.
3) Coordinate between departments, including suppliers and partners.
4) Risk Management and develop strategies to address challenges.
5) Control project budgets and report project status to management.
6) Promote process improvement, teamwork, and ongoing efficiency enhancements.
7) Promote the growth of the team and members